Human Spaceflights

International Flight No. 121

STS-29

Discovery (8)

USA

Patch STS-29 Patch STS-29 TDRS-D

hi res version (765 KB)

 
Patch STS-29 CHROMEX

Launch, orbit and landing data

Launch date:  13.03.1989
Launch time:  14:57 UTC
Launch site:  Cape Canaveral (KSC)
Launch pad:  39-B
Altitude:  340 km
Inclination:  28,5°
Landing date:  18.03.1989
Landing time:  14:36 UTC
Landing site:  Edwards AFB

walkout photo

Crew STS-29

hi res version (954 KB)

alternate crew photo

Crew

No.   Surname Given names Position Flight No. Duration Orbits
1 USA  Coats  Michael Lloyd  CDR 2 4d 23h 38m  80 
2 USA  Blaha  John Elmer  PLT 1 4d 23h 38m  80 
3 USA  Springer  Robert Clyde  MSP 1 4d 23h 38m  80 
4 USA  Buchli  James Frederick  MSP 3 4d 23h 38m  80 
5 USA  Bagian  James Philipp  MSP 1 4d 23h 38m  80 

Crew seating arrangement

Launch
1  Coats
2  Blaha
3  Springer
4  Buchli
5  Bagian
Space Shuttle cockpit
Landing
1  Coats
2  Blaha
3  Bagian
4  Buchli
5  Springer

Flight

Launch from Cape Canaveral (KSC); landing on Edwards AFB.

The launch was originally scheduled for February 18, 1989 but was postponed to allow for replacement of suspect liquid oxygen turbopumps on the three main engines.

Main goal of this mission was the deploying of the third and final communications satellite TDRS-D; different scientific work in biology, crew also photographed Earth with hand-held IMAX camera.

Photos / Drawings

Space Shuttle crew in training
STS-29 rollout STS-29 launch
TDRS-D STS-29
TDRS-D deployment STS-29 landing
return to KSC  

©      

Last update on December 10, 2011.

Back to homepage SPACEFACTS